AdminHelpdice Team30 May, 2024Who will complete the work first? I. X can do the work in 15 days. II. X can do y of work in 10 days. Y can do 40 % of work in 40 days.Select Option & Check AnswerI onlyII onlyEither I or IIBoth I and II not sufficientBoth I and IICheck AnswerIncorrect. ❌Related MCQ's Choose the answer option that arranges the given set of words in the most meaningful order. The words when put in ...Wed, 26 NovGiven signs signify something and on the basis, assume the given statements to be true and find which of the two c...Wed, 26 Nov(i) There are two lecturers, two singers, one doctor and one engineer in a group of six people- A, B, C, D, E & F....Wed, 26 NovA driven 10 km towards East and turns to the right hand driven 3 km. Then he drives towards West (turning at his ri...Wed, 26 NovA tank has dimensions 14 m x 12 m x 10 m. A drain pipe can empty the tank in 76 hrs. Amnia supplies water at the ra...Wed, 26 NovThere are four varieties of pipes Pipe A. Pipe B. Pipe C and Pipe D. Eachpipe can be either an inlet pipe or an ou...Wed, 26 NovTwo taps can fill a tank in 12 min and 18 min respectively. Both the taps are kept open for 2 min and then the tap ...Wed, 26 NovPipe A can fill a tank in '3' hours. On account of a leak at the bottom of the tank it takes thrice as long to fill...Wed, 26 NovPump can he used either to fill or to empty a tank. The capacity of the tank is 3600 units. The emptying capacity...Wed, 26 NovThere are 12 pipes attached to a tank. Some of them are fill pipes and some are drain pipes. Each of the fill pipes...Wed, 26 Nov